How Long Does a Builders Clean Take?

How Long Does a Builders Clean Take?

How Long Does a Builders Clean Take?

"How long will the clean take?" is one of the first questions builders and site managers ask. It makes sense. The clean is often the last thing standing between you and handover. The short answer is that a builders clean takes as long as the site needs, and that depends on a handful of factors you can plan for. This guide explains what drives the timing and how to keep your clean on schedule.

A builders clean is usually more than one visit

Most builders cleans are done in stages rather than in one go. There is a rough clean after the major trades, a detailed final clean once everything is installed, and a handover or sparkle clean just before the client inspects. We explain each stage in what is a 3-stage builders clean.

Each stage takes a different amount of time:

  • The rough clean is about clearing debris and heavy dust. It moves quickly across large areas, but on a dusty site it can take longer than expected.

  • The detailed final clean is the longest stage. Every room is cleaned from top to bottom, including windows, tracks, cabinetry, fixtures and floors.

  • The handover clean is the shortest. The building is already clean, so this visit deals with settled dust, fingerprints and any marks made since the final clean.

So when you ask how long a builders clean takes, it helps to ask how long each stage will take, and how much time you need between them.

What affects how long a builders clean takes

Size of the building

A single-storey home is quicker than a double-storey home with the same number of rooms, because stairs, balustrades and extra windows add time. Townhouse and apartment projects multiply that by the number of units.

The type of project

A new build, a knock-down rebuild, a renovation and a commercial fit-out all leave different mess. Renovations can be slower than they look, because dust gets into areas that were never part of the work.

How much dust and residue is left

Plaster dust, paint overspray, grout haze, silicone and adhesive all take time to remove safely. A site where trades have cleaned up after themselves is much faster than one where they have not.

Windows and glass

Large glass areas, sliding doors, louvres and tracks take more time than most people expect. Stickers, protective film and paint spots on glass all need careful removal.

Floors and surfaces

Different floors need different methods. Timber, tiles, vinyl, carpet and polished concrete all clean differently, and delicate surfaces such as stone benchtops need extra care. Using the right method takes longer than a quick mop, but it protects the finish.

Access, power and water

The team needs safe access, working power and running water. If the site has no water connected, or trades are still working in the same rooms, the clean slows down.

Trades still on site

Cleaning around other trades is the biggest cause of delays. Dust from a late trade can undo a finished clean, and that means returning for another round.

Team size

A larger team can finish a site faster. A good cleaning company will plan the team size around your handover date rather than the other way round.

Checklist: how to keep your builders clean on schedule

  • Book your cleaner as soon as you know the handover date

  • Confirm which stages you need and when each one should happen

  • Make sure all trades have finished before the detailed final clean

  • Remove skip bins, rubbish and leftover materials

  • Have power and water connected and working

  • Remove protective film from windows and appliances, or ask the cleaner to include it

  • Leave clear access, keys and alarm details

  • Allow a gap between the final clean and handover for any touch-ups

  • Book the handover clean for the day before inspection, or the morning of

Our guide to preparing a new build for handover covers this planning in more detail.

How a cleaner estimates the time

When you ask for a quote, a professional cleaner will want to know the address or lot, the type and size of the building, the stage of works, the handover date and anything unusual, such as large glass areas or special surfaces. Photos help too.

With that information, the cleaner can estimate the hours for each stage and plan the team to suit. If you have a tight deadline, say so up front. It is far easier to plan a bigger team in advance than to find extra hands the day before handover.

How we handle builders cleans

Greater West Cleaning Services cleans new builds, duplexes, townhouses, renovations and commercial fit-outs across Western Sydney and Canberra. We offer all three stages and plan them around your trades and handover date. Every project is custom quoted, and a 50% deposit secures the booking. See our post-construction cleaning and builders and developers pages for more.

Common questions

Can a builders clean be done in one day?

Small jobs, such as a minor renovation, can often be done in one visit. Larger projects usually need more than one visit, and staged cleaning gives a better result.

How far ahead should I book?

As early as possible. Once you have a handover date, book the stages you need so the team can be planned around your program.

What happens if trades come back after the final clean?

Any new dust or marks will need another clean. That is why the handover clean is done last, just before inspection.